BACKGROUND

A €2billion project, Gwynt y Môr consists of 160 turbines in Liverpool Bay, off the
North Wales coast.  

EDS'S INVOLVEMENT

EDS secured the contract for  the termination and testing of the inter-array cables
for 160 turbines at this site. In addition, EDS undertook containment design,
containment construction, cable-routing, termination design and testing.

Additionally, EDS made available the ability to build a life size transition piece mock-up facility in
the UK. This ensured a 'right first time' approach,  a clear step in reducing the cost of energy.